Year 2022
Saturday, 31st of December
Happy New Year!
Best wishes for a prosperous new year! It won't be as
difficult as we are told it will be!
Saturday, 10th of December
Comments About Government
So many people seem hung up with the idea that
"American Democracy" is "at risk" or "under fire".
It is not. In fact, the government of our Republic is
operating more or less as it should be running. It
was devised to be limited, affording the States and
citizens the maximum amount of choice.
That is why I encourage the repeal of Roe vs. Wade.
This action returns choice to the States. Ideally, I
would prefer that this choice be left to the individual;
however, the repeal is a step in that direction. It seems
to me that those angered by the Supreme Court's
decision wish to have the federal government dictate
terms to the States. I discussed the repeal with one
individual, and he said that the States and individuals
shouldn't be allowed a choice.
This attitude is a product of arrogance to some degree,
but mostly due to the "dumbing down" of the
populace. Ignorance has been encouraged. It's useful to
convince a population that the federal government
needs to be expanded for various reasons like
"protecting women's rights". "We can't trust rednecks
in the South to do what's right." Yes, a self-proclaimed
enlightened individual in Massachusetts actually
made that remark!
This comment also shows the growing division
between parts of the United States. The "us versus
them" attitude may smack of the rivalry witnessed
during a sports game; however, it is more deeply
seated and more dangerous. There are individuals in
this nation who feel that they can pass judgement
on individuals in other regions, despite never having
visited these areas. It makes little sense, but it is
reality. Most commonly, it is the well-educated who
wish to boss around those whom they label as
"uneducated".
The irony continues in other aspects of life if you
take the time to stop and look around you! It would
help life if people switched off their mobile phones
and actually spoke with others in person, not via
e-mail or video chat. Then, perhaps, folks would
realize that we all pretty much have the same view
of government: leave us alone!
Site Updates
I've added one film & one TV program to the
GRS database.
Enjoy!
Saturday, 19th of November
Honeybees
Before I left for the West, I installed 1 1/2" thick insulation
around the bee hive. It worked out quite well. Take a look
here.
Mom said that she would feed them through the winter.
Hopefully, that will be enough, because I was unable to
reach the target weight. It's so difficult establishing a bee
colony without fields.
Donna and I are planning to plant
wildflowers along the edge of her driveway and along
my frontage in front of the apiary in a continuous swath.
They should help
a lot. Just need to get the trees felled first!
Road Trip!
I am now in Arizona and had plenty of time to think about
things along the way. I have driven across the country
ten times! Here are some highlights:
I stayed in a Queen Room at the
Historic Route 66 Motel
in Tucumcari
It is stylized in what I know of
the late 1960s style. Comfortable place.
I experienced some icy road conditions between Santa
Rosa and Moriarty, New Mexico. They were not sanding
or salting, just plowing the two inches of snow into ice.
Nasty!
"The Best Fudge Comes From Uranus!"
Yup, that's the catch phrase of a store in Missouri. It's
a UFO-themed tourist stop. Since it's on the other side
of the Interstate, I didn't even think about stopping.
Visit their website
here.
Site Updates
I've added five films to the
GRS database.
Two new photos are on the
page:
Enjoy!
Saturday, 29th of October
Honeybees
I'm feeding the colony again. I install feeders in the afternoon,
and it appears that the 'bees are collecting before they cluster
for the night. The weight of the colony is rising despite
cold nights and no more foraging. The feeder is probably
being robbed; however, I believe that my colony is collecting
a majority. Today, I added a second gallon feeder. The other
one still has some left in it. I'll fill it as soon as it's empty.
I installed 1/2" thick insulation under the bottom cover.
I hope that it stops any cold upward drafts.
Camper
I replaced two pairs of leaking fresh-water lines. I had a
significant leak. That leaks appears to have stopped. I'll
know within a week if all the particle board dries out. Also,
the subfloor was being affected. Fingers crossed all is
well now. The water pump doesn't cycle much anymore.
Site Updates
I've added four films to the
GRS database.
Enjoy!
Monday, 17th of October
Honeybees & Grapevine
The honeybees are still collecting supplies for the winter.
I weighed the hive on Sunday, and it was still 13 lbs
underweight. That's not too bad. Three pounds in a week
during the autumn. I still think that I'll need to feed them.
Though, it could be much worse. My neighbor Chris, who
also just started a colony this year, said that he had only a few
frames drawn. It is a sad thing that it's so difficult to
start honeybee colonies. I'm going to feed mine as long
as I can do so.
I've learned from last time. I have cut two-inch-thick,
closed-cell
foam insulation to enclose the walls and top of the hive.
I will seal them together with duct tape. Donna showed me
her niece's thriving bee hives. She has four now. Two would
have been swarms. Of course, she lives in Rhode Island,
which has much more temperate weather.
The grapevines still haven't dropped their leaves. I figure
they will do so within a week. Then, I'll trim the stems
and mound gravel around the rootstocks. Also, I have
fencing that I can install between the posts in a vertical
orientation. A photo will be forthcoming to show what
I mean.
Autumn
I like seeing the leaves turn on the trees. But when the leaves
drop into the forest, it's electric! The bright yellows
and orange blanketing the forest floor is
something to see. I walk through my woods every day,
and I really enjoy it when the leaves are just down. The forest
seems so vibrant!
Since I will be a "snowbird" this year, I have offered my
Kubota to John for the winter. He snapped it up and collected
it on Sunday. He is going to spread gravel on a second
driveway and use the tractor to clear
snow. Don't worry about it, as he is the guy from
whom I purchased the vehicle! Of course, I'll get it back in
the spring.
Site Update
I've added four films.
You may have noticed the two new
icons in the entry pages. They allow you to navigate
through the entries as they were entered. It can be a
great way to pass the time. They look like this:
Here is the customary link to the
GRS database.
Monday, 10th of October
Cellar, Honeybees, Plants
The cellar is covered and ready for the worst that winter
can provide! I am now concentrating on getting the rest of
the lot ready for winter.
The bee colony is about 16 pounds underweight. I'm
monitoring the weight and will feed it when it's cooler.
The grapevines are almost finished. The leaves of the
fruit trees are turning. The hops are just about done.
Site Update
I've added 11 films and two TV programs to the
GRS database.
Enjoy!
Wednesday, 28th of September
Cellar
I finally have the time to upload some photos of the
cellar floor! You'll notice how grey it is compared to the
bulkhead footing. "Green" concrete is actually more gray
than more seasoned concrete!
I marked the year in the floor for posterity, because
this structure will easily outlive me. The safes are slightly
proud of the floor, which is good. The floor drain is flush,
and the floor locally slopes slightly towards it.
Next year, we'll fill-in around the safes and walls
where the plastic sheets left air pockets. No big deal.
We'll add some mortar when we resume work on the
block walls.
Next task is to cover everything for the winter. John
and I will build a temporary roof on Saturday using
pallets, planks, and plastic. Also, I have some old
steel roofing from my neighbor James, which will be
useful.
Honeybees
I was feeding the colony for two days. Then, I saw the
hive being robbed. I'll wait to feed my hive until it's
cooler. High temperatures of mid to low 50 degrees
will minimize the robbing.
Saturday, 24th of September
Cellar
John and I poured the floor today. It's nominally 3-1/2"
thick. It required 50 80-lb bags of concrete mix. Yeah,
that's two tons! Considering that I moved and emptied
all but one bag, I feel pretty good.
I had installed a drain and two safes. I leveled them. I did
have the drain too high, so we cut the drain for the
bulkhead and used it. A quick fix that worked. I don't have
a finished photo yet; however, you can see what it looked
like after I lined the stone & footing with plastic. The 6-mil
sheet will help reduce moisture from rising through the
stone. The plank down the middle allowed access to the
middle of the pour. See it
here.
Camper
Both the furnace and water heater are working well. It
was in the 40s overnight last night! I believe that I've
caught up with the updates and problems. The oven
thermostat is failing. I couldn't find a replacement, so
the entire unit with the stove will have to be replaced.
That's a job for early autumn or late spring. I have decided
to drive to Arizona and stay with Mike. He's happy, as am
I! I'll take the Dually. Yes, it'll be expensive. But I want to
do it while fuel prices are reasonable. Plus, it has cruise
control. The Mazda does not, and it is tiresome on the
long stretches in the Southwest.
No Honey
The honeybees were patroling the two supers but drew
no comb, which means no honey for me. I will need to
feed them, so they have enough to get through the winter.
Next year I should have honey.
Wednesday, 14th of September
Camper
I have previously reported that the water heater and A/C
unit developed faults, which I rectified. Now, the
furnace is showing its age. I tested the delivered pressure
with a homemade manometer. (You know that I love making
these DIY gauges!) The pressure was about half what it
is specified to be at a minimum.
I was able to locate a replacement solenoid valve. Since my
trouble with the water heater, I've learned that the solenoid
in pressure valves weaken over time. I assumed the same
trouble here. I was rewarded, as the furnace seems to be
working correctly. Of course, it only runs during the night
when I am in bed. I sleep lightly so I can hear when it fires,
or doesn't!
The water heater had been misbehaving. It would "explode"
when unburned gas was suddenly ignited. Of course, this
situation would also blow out any flame that may have
sprouted. I believe that the reason is that the ignitor could
move out of the gas cloud. I have rectified that problem, and
have not experienced any explosions. (The explosions are no
risk to me, as the water heater is enclosed in steel. Instead, it
blows off the grill, some times several feet away!)
Cellar
Since I have last written, John and I poured the bulkhead
footing. This footing could not be part of the main footing,
as they are separated by 8 inches in the vertical dimension.
The form was completed and backfilled, to prevent a blowout.
See the result
here.
John and I used my transit to check the level of the guide
nails in the wooden forms. These nails make it easy for us
to know when the top of the footing is level. (We did the
same thing for the main footing.) Would you believe it, that
we were within a 1/16 of an inch all the way around the form?!
The footing worked out well. There are some inclusions at
the bottom of the footing because I overfilled inside the forms.
They will be
either filled with concrete, or, more likely, be filled with crushed
stone. Take a look
here.
The next step is to pour the floor. John and I had been enthusiastic
about pouring the cellar and bulkhead floor together. I've decided
that we will just pour the cellar floor for now. The decision was
made according to my level of energy. Pouring the bulkhead floor
would mean two trips with the Dually to buy concrete mix.
Pouring just the cellar floor means only one 2,400 lb trip. Yes,
I admit that I'm wimping out. Think about it: working a day in
the office, then driving 45 minutes in a Chevy truck, loading
2,400 lbs of concrete mix into it, driving back--albeit in a
"concrete Cadillac"--, and then unloading it. That is enough work
for one day--or a week!
I have become quite strong. In fact, John admitted that I am
stronger than he is right now. And he's never a weakling, just
older than me. Though, I must draw the line at moving more
than a ton of concrete twice in one day.
To put my current strength into persepective: today, I easily
shifted a fully
loaded fridge/freezer for Donna, my kind neighbor who provides
my camper and me with electricity and a Wi-Fi connection. She
said that
she planned to recruit "two big guys" to move it at the weekend.
I think my strength may have startled her so I explained that I
had been moving tons of concrete mix.
The next steps for the cellar are to level the height for the cellar
floor. I think I need another tractor bucket load of crushed stone.
Then, I should have sufficient crushed stone to the top of the
cellar footing.
I don't want to run out of concrete mix while pouring the floor!
Next, I will spread a layer of 6-mil plastic on top of the stone. It
will reduce
the amount of moisture seeping into the underside of the
floor.
James, my other generous neighbor, gave me some old, steel fencing.
I have the rusting net weighted-down in the driveway.
It will make a good mesh for the floor. Yes, I even plan to reinforce
the cellar floor. Do the job right! I will cut the fencing into smaller
pieces next week before the floor pour.
James also gave me some old steel roofing. The stuff is excellent!
I'm using it to protect the bulkhead footing from the rain. It's
galvanized, so it's only slightly rusty on one side. Sure, it's not
useful for a roof, because it's twisted; but it's perfect for my purposes!
Stay tuned for the exciting conclusion of year 2022's project!
Site Updates
I've added seven films to the
GRS database.
This batch includes a new favorite!
Please, take the time to enjoy it!
Sunday, 28th of August
Bees
I have dismantled the purple hive and returned it to Mom.
We'll set up an electric fence
at her place and establish a new colony in her hive there.
The population of the white hive is decreasing. The queens
of honeybee colonies know to reduce laying by the sinking of
the sun in the sky. It's puzzling to me, as the queen doesn't
set foot outside the hive once she is mated. The information
must be transmitted to her via tha colony. Fascinating!
Japanese Beetles
The grub killer is down. I should have a lot fewer Japanese
beetles next year. I have plans to plant onions between the
grapevines. They should repel the blasted beetles.
Today, I dug up and covered an area near the affected fruit
tree and blueberries. Garlic and onions will be planted there
in the late autumn and spring, respectively. I hope it smells
terrible, Japanese bastards!
Cellar
Laying the first course of concrete blocks is completed. It's a
slow job to ensure that the rectangle is square and even. Though,
thanks to John's fortitude, the total deviation is no more than 1/4 inch!
I have installed drains in both the bulkhead area and the main
cellar. Also, I had a revelation, which will allow us to pour a
continuous floor underneath the bulkhead and the roof. This
decision will save us a lot of time. It will remove a step, which
will save me bonking my head on the lintel when entering the
cellar.
Unfortunately, the cellar will not be finished this year. "Like most
things: we were ambitious... and rubbish!" It's not the end of the
world. I'll cover the walls for the winter.
I decided to fill the walls
with concrete. It'll be hell; however, they will never move. I am
in the process of drilling into the footing and installing vertical
rebars. Rebars will be placed vertically as we build the walls. I
cannot install vertical 'bars the entire height because it makes laying
blocks a nightmare. Instead, I will install rebars every three or four
courses.
Combined with
the drainage system, this cellar should withstand anything. John
says that he knows where to go in the event of a nuclear attack!
Without further prelude, I shall share a shot of first course. You will
notice that only one drain is uncovered. I use traffic cones to warn
us away from them while we're working. The 2x10s make perfect
rain shields for the walls. I don't want to have to bail out water from
inside the blocks! Next step is to frame the bulkhead footing. You can see
that it is partially completed. Take a look by clicking
here.
It's a lot of work!
Site Updates
I've added five films & one television program to the
GRS database.
Please, enjoy!
Sunday, 14th of August
Bees
The purple colony has failed. I confirmed that there was no
queen and little brood. There are a few large cells. I believe
that the queen didn't work out, and the colony attempted to
raise another queen, which also failed.
The colony in the white hive is thriving. Bees were actively
patrolling the top super. No drawn comb yet. The goldren
rod flow started a week or so ago, so there's pollen to forage.
The bees found water collecting in a low, plastic lid. They like
it more than the terra cotta dish with stones in it that I had left
out for them.
Japanese Beetles
They've learned to stay away from the trap. I'll apply grub
killer when I purchase a spreader. I've been killing them when
I can do so.
Cellar
Work on the cellar is proceeding well. I've filled inside the
footing with crushed stone. Also, I purchased 1,600 pounds
of mortar mix. It's under the new, blue tarp in the left of
this photo:
Then, I began work on the perimeter drain. This perforated,
flexible four-inch plastic tube allows water to flow to the
dry well. (I forgot to report that the dry well was able to keep
up with two hurricane's worth of water back-to-back.)
I wrapped the perimeter drain pipe in landscaping fabric
and covered it with crushed stone. After the walls are done,
and I backfill, I'll keep 6-8 inches of stone against the walls.
The benefit of this stone is two-fold:
1. it allows surface water to quickly drain to the perimeter pipe &
2. it stops frozen ground from pushing in the walls.
(If there's no water in the material near the walls, it
cannot freeze. Remember that water expands when it freezes.
Good for fish, bad for the walls of bermed buildings!)
Also, I wrapped the drain to the dry well with landscaping
fabric and covered it with crushed stone. I probably won't keep
filling above it with stone. Instead, I will cover the area with more
landscaping fabric and backfill it with draining material.
I almost made it all the way around the footing with one
50-foot roll of perforated drain pipe. It was 36 inches short.
No problem, as I have several unions and some 4" solid pipe
with slits cut into it.
Recall, my failed water well project? I used pipe from it. The
great thing about plastic is that it never ever rots! All I had to
do was wipe it off and blow out the leaves. To poorly quote
George Carlin: the Earth just needed us to make plastic.
I used local stones to keep the perimeter drain against the
footing. (I'm running low now--NOT!!) Then, I could cover the
drain without concern that it would shift. Below are a few
photos of the process:
What, you may ask, is landscaping fabric. It's a woven plastic
that allows water to drain through it but stops most everything
else. It's usually used to stop weeds from growing in flower beds.
In this case, it will stop the crushed stone from diffusing into the
earth beneath it. But, more importantly, it will stop any soil above
it from clogging the stone bed.
It's much like the Black Knight in
Monty Python and the Holy Grail:
"None shall pass." "What?!" "None shall pass."
I have
a photo
to show you what I mean. It's a close-up of 3/4"
crushed stones--the same stuff that I use for drainage. It has been
on the ground for a couple of weeks. John and I have walked on
it. You can see that it is slowly moving into the ground. This
ground is fairly packed, too.
Below is an image of the three-foot-section that I had to add to
finish the perimeter drain:
Yesterday was a long day but a productive one!
I was very pleased to finish the entire drainage system in one day.
That's why I forgot to sweep the footing before snapping a photo.
Please, excuse my footprints:
Even the Kubota wanted a little recognition, which is well deserved,
as it sneaks its bucket into the frame!
The next steps are to lay a course or two of blocks. I have purchased
nifty, steel block spacers that will maintain the correct mortar thickness
when two are pressed into the mortar bed before laying a block. "Stay
tuned: same Bat channel, same Bat time."
Home Happiness
Since I'm going to be living in this camper for the foreseeable future,
I have been improving it. I replaced all the blinds and shades. The
replacements are so wonderful that it's difficult to explain why I
waited so long.
I guess that I was afraid of the cost. I was happily mistakened,
because three custom shades and four custom blinds were shipped to
me for less than $300! Yes, I did buy during a 1/2 price sale.
Being the stickler for detail, I also installed blinds keeps. These plastic
doodads keep the bottom of the blinds in place. The camper
originally had them; however, those keepers have long since solarized
and have snapped off.
The shades are thick, light-blocking units. They are wonderful! With
them drawn, I could probably sleep during the day without a problem.
And, I'm a light sleeper.
I replaced all the interior light fixtures, save one, with new units. These
"Euro" fixtures are slightly larger. And that made replacing the fixture
in the shower stall impossible. That's a good thing because I now have
many spare LED bulbs for it!
It took me quite a bit of time to acquire LED bulbs for the new fixtures.
They are different than those they replaced. I haven't replaced all the
bulbs with LEDs. I just replaced the ones that I use all the time. You'd be
really surprised how many lights there are in a camper. My smallish
(19 & half foot) camper uses more than a dozen bulbs just inside!
I have also replaced a switch that always required a momentary dip
towards "off" to work. Sure, it's a minor annoyance. I just think that
if I address problems as they arise, then I will keep ahead of them.
Sunday, 7th of August
Bees
I watched the white colony rob the purple hive. I installed
an entrance reducer to give the purple colony a smaller
entrance to guard. Their numbers continue to decline. I
suggested that Mom set up an apiary at her place next
spring. It wouldn't be too expensive.
Japanese Beetles
I found and destroyed Japanese beetles on the blueberry
bushes. At least, they aren't on the fruit trees again. The
beetle trap seems to work. I'll wait to apply the
grub killer a bit long.
Cellar
I removed the inner form, cleaned the area, leveled the
dirt. Also yesterday I dug a hole for in-floor safes. They
will be flush with the floor and encased in four inches of
concrete. That'll make them pretty secure! I concluded
the day by installed landscaping fabric inside the footing.
Today, I started covering the landscaping fabric with
crushed stone. It will allow any water that finds its way
under the footing to drain to the perimeter drain. Even
with the tractor to move the stone to a makeshift ramp,
it's hard work! I moved about a yard and leveled it. That
amount is about 60% of the volume inside the footing.
This past week the concrete blocks arrived. They're not
what we wanted; however, they'll have to do. Worst case,
we'll have to fill the walls. That would be fun--NOT!
I'll finish filling the footing and install the perimeter
drain next weekend! I'm worn out now! I cover the safes
so that they won't fill with water. Two five-gallon buckets
conveniently fit perfectly! Below are some photos:
Flowers
The sunflowers are full of huge flowers! One hop plant is
flowering, finally. It looks like a male. I want to keep only
females. They provide the best cones. I'll verify that it is a
male and dig it up and offer it to someone who doesn't
mind.
Friday, 5th of August
Bees
The purple colony continues to decline, despite every other
day feedings of 2-lbs of sugar water. I am now sure that drifting is
occurring. Short of relocating the colony, I have no recourse.
I would be happy to move the hive somewhere else; however,
I fear an attack from a bear, once it is outside of the electric
fence. There is at least one active bear who traverses the lot,
as I have posted. So, I'll continue to feed the purple colony.
In contrast, as seems usual in nature, the white-hive colony is
booming. Bees were "hanging out" on the landing board. I had
added a honey super to provide them with more hive space.
The additional real estate helped but didn't solve the problem,
so early this morning I added a second super. The first super
was being patrolled but had no drawn comb yet.
The additional super made a difference, because today the
only bees outside were fanning. It was a high-80s day so they
were using their wings to drive air through the hive. Think of
that next time the air-conditioning compressor clunks to life,
and you cringe at the future electric bill. You could be fanning
yourself cool!
Vineyard
I installed a beetle trap about 50 feet away from the vineyard.
It has collected
some of the bastard Japanese beetles. I still flick and stomp
beetles from the grapevines.
I discovered one of them on an apple tree. I promptly killed it.
This discovery made the decision. I purchased enough
grub killer
to cover, in the prescribed amount, my weed-grass along the
road, in the vineyard, and in the orchard. That should reduce
the invaders. I just need a day of--a sure bet--forecasted steady
rain before I can apply it. Till then, I'll kill beetles by hand, and
enjoy it!
Normally, I hate to destroy life. But these Japanese beetles
are voracious. They can skeletonize the leaves of the weed-like
grapevines quicker than the 'vines can grow leaves! Bastards
will get what they deserve!
Cellar
John and I managed to pour the footing last Saturday. For
some reason we ran out of cement. (Recall that concrete is one
part cement, two parts sand, three parts stone.) It demanded
a quick response. I found a pitiful amount of cement at the
local hardware shop. I set my sights on the "big town" near me.
With big towns comes big ignorance... I did manage to buy
most of the concrete mix that they had in stock. Yeah, the
just-add-water stuff. It did save our project, at a cost. I thank
Andy for his selection of one-ton trucks. My Dually, which was
his pride, didn't really notice the 2,500 pounds in the bed.
Yes, 2,500 pounds is more than one ton. I was desperate. Upon
later examination, all the leaves in the springs weren't fully
collapsed. One leaf still wondered what all the bother was!
The engine, a monstrous 454--7400 Vortec, as Chevy
liked to name it--took notice but didn't really care. Amazing
machine. Thank you, Andy!
The results of our efforts were rewarding. But before that unveiling,
I need to show the forms covered with plastic. I wrote that I had
protected the forms from rain, but never posted an image. Sorry:
my mistake.
Here's the footing with the outer form removed. The inner footing
is more challenging to extract, because it had to be nailed from
inside the forms. Yes, removing the inner form is a pain in the butt!
I have since accomplished the task. I will post photos next entry.
Until then, here's how's
the footing
looked.
I placed pipes in all four walls to allow water to drain through
the footing.
It's important to drain under the future concrete floor to remove
any possibility of heaving during the winter. The drains are smaller
than the standard 4-inch; however they will do the job. Take a look
at
one.
I will ensure that the underfloor volume is free of water by lining it
with landscaping fabric before installing stone. The fabric creates a
barrier to prevent the stone from migrating into the small depth of
sub-soil. It's probably overkill, as the sub-soil resides only a few
inches above a solid piece of granite.
Really, it's cheap insurance for an already good drainage system.
A few hundred dollars spent today could save me thousands of
dollars of unexpected flood in the future.
Site Updates
I've added four films & two television programs to the
GRS database. Please, enjoy!
Friday, 22nd of July
Bees
I've installed the tacky mat and screened bottom board in the
purple hive. Despite feeding it, there's no growth. I fear that
workers are drifting to the white hive. This transfer could
spell disaster for the purple colony. I'll continue to feed it.
Vineyard
All vines are growing new canes. I'll let them grow unchecked.
The main problem now is the Japanese beetles. I had sprayed
the grapevines with a commercial insecticide twice. It doesn't
work! I'm now spraying with a homemade mixture. If it doesn't
work, then I will have to use larva killer. I hate to kill everything
in the vineyard, but I need to take control of these blasted
Beetles!
Cellar
Running the rebar inside the forms was a lot easier than I
expected. Ha! Take a look
here!
John and I will pour the footings next weekend. I covered
the footings with plastic to keep out water. It's a good thing, because
we experienced a deluge yesterday. The hail was large enough
to hear it banging on the camper's roof! The drainage around the
cellar footing performed well. I wasn't worried
Site Updates
I've added ten films to the
GRS database.
Enjoy!
Sunday, 10th of July
Bees
The bees continue to work hard. The purple hive is still much
smaller. Only a few of the 10 frames have been drawn. The
population should increase soon as the new bees hatch. Let's
hope! I continue to feed it.
I installed the tacky sheet in the white hive, because it already
had a screened bottom board. I'll install the screened bottom
board in the other hive when I next fill their feeder.
Vineyard
The silver buds are not waking up on the top cordon. I'm going
to let them grow fairly freely from the base. I'm concerned
that they won't have enough energy for next year, if I don't.
I've been removing any bud that's not along the six-foot line.
A long term solution for this problem would be to install a screen
vertically between the uprights and allow a few canes, from each
grapevine, to grow
up them. Since grapes bear on the same year's wood, they would
bear fruit. Then, I would cut the canes down every autumn. I don't
know what else to do.
It's not a traditional solution. I would treat grapevines like hops.
But it works for hops. Also, it would eliminate injury from the
winter. I'll see if I come up with another solution before this fall.
Maybe leave some canes that turn brown and see?
Cellar
There is good news! John and I built the forms for the concrete
footing. This structure will support the concrete while it cures into
the footing. Then, we'll lay concrete blocks on the footing to
build the cellar walls. Here's
a photo!
The next steps I will accomplish alone. I need to cut four inch
pipes to fit in between the planks. Each wall needs a path to
allow water to flow through the footing. They will keep the crushed
stone under the floor drained of water. I could drill a hole
in the floor, if I need a drain inside the cellar.
Next, I will install two runs of rebar. They will make the concrete
reinforced. The steel provides the tensile strength, which
concrete lacks. Reinforced concrete is the basis for all modern
buidlings and is exceptionally durable!
I need to collect the materials to make concrete. I'll have crushed
stone and sand delivered. I need about five yards of each
aggregate. I'll pick up the Portland cement with the Dually. I'll
see if they will load it into the bed.
Otherwise, I'll buy as much
as I can move with a cart and make two cart trips, if needed. I had
about 600 lbs in a Lowes cart last week. Two cart loads would be
give me the dozen 94-lb bags that I need for the footing. That
amount includes a few extra bags. I'd hate to be short cement right
at the end of pouring!
Twenty Years!
Thursday is the twentieth year anniversary of this website!
One of the kids at the grocery store remarked that she was
born in 2022. Then, she corrected it to 2002. Ha, I have a
website that's older than her! I also have clothes that are
older and still fit well. Not too many folks can make that claim.
Frozen pizza for supper--I've earned it
Site Updates
I've added six films and a TV program to the
GRS database.
Enjoy!
Sunday, 3rd of July
Happy Independence Day!
Bees
The one hive is still weak. Though, I see foragers returning with
pollen. I'm still feeding it. The other one has
a large population and had just about filled the bottom box
so I added the frames to the top box and a beetle trap.
Small hive beetles are newcomers from abroad. They lay eggs
unknown to honeybees until they overrun the 'bees. The trap,
which I installed, is simply a plastic container partly full of
olive oil. It has openings on the top that allow the beetles to
fall through, but not the 'bees. The honeybees chase the beetles
around the frames. This trap fits between the frames.
Soon, I will be installing tack pads to monitor mites. These tacky
sheets are positioned under the bottom of the hive. As long
as the hive has a screened bottom board, they work well. The
beekeeper can then watch the frequency of mites dropped
by the 'bees as they groom one another. If the density of
mites on the pad--count per square inch--becomes too high,
then I will give them medicine.
Vineyard
The silver buds have been slowly awakening from the base
of the grapevines. Since I am concerned about them missing
weeks of growth, I removed all silver buds below those on
the six-foot-high cordon wire. My intention is to force the
'vines to bud from the cordons, forming vertical spurs. I'm
still learning. Fortunately, grapevines grow like weeds.
Trellis for Hops
Speaking of weeds, my neighbor suggested using cattle
fencing as an inexpensive trellis for my hops. I still haven't had
any hops flowers, so I can keep only the females. John had
mentioned that they probably don't flower, because they
are not in the ground. Well, five of them are now!
I secured the cattle fencing to the trunk of a bull pine tree.
At the base, it is held in place by two plastic tent stakes.
Click for
a photo.
Hops are perennials; however, their growth should
be chopped to the ground every autumn. That's when I'll
lower the fenc--err--trellis to the ground and collect any
hops cones. Stay tuned to see their progress!
Orchard
The fruit trees are all growing well. I did mulch around
their bases. I need to adjust the ties on them tomorrow.
It's impressive how well they are doing! I snapped a couple
of photos last week and have stitched them together
here.
Site Updates
I've added six films and a TV program to the
GRS database.
Enjoy!
Sunday, 19th of June
Bees
The hive with the replaced queen seems to be OK. I found
eggs a few of weeks ago. The population of workers is smaller
than the other hive, which is thriving. Hopefully, the weaker
one will strengthen! I will continue to feed it.
Contract
The new contract is going well. There are some challenging
aspects. Working from home is a lot easier than I thought it
would be!
Plants
The grapevines didn't "wake up" the silver buds further up
the trunks, so I removed the new trunks that were forming.
I've been removing any bud, as long as there's one higher up.
All of the fruit trees are doing well! I've been weeding and will
put down mulch tomorrow. I hope that it will not only
keep the weeds down, but discourage insects from boring into
the young trees.
I planted a Butterfly Bush. It supposed to be desirable by
honeybees, also. We'll see.
Cellar
The drainage worked well. I tested it by simulating an inch of
water for 24 hours over twice the area of the cellar. That
would be the worst that could ever happen here. A hurricane
that stalls overhead. It passed my timed test. Then, I repeated
the test and that was acceptable. I filled the pit with stones and
covered the entire area with landscaping cloth. That will keep
out everything but water.
John and I leveled base for the cellar. Next, we can build the
forms for the concrete footing. There will be a separate
footing for the bulkhead door, since that area is about six inches
higher. We'll pour the cellar footing first, lay a couple of
courses of blocks, then pour the bulhead footing against the
blocks and cellar footing. It sounds complicated. It really isn't!
I'll post photos once I get the cellar footing in place.
Site Updates
I've added five films to the
GRS database.
Enjoy!
Thursday, 26th of May
Bees
The queen of one of the hives didn't produce eggs. She may
have been sterile, killed, or flew away. That explains why that
colony was so aggressive! Fortunately, she was insured so I
collected a new queen and installed her. The bees are calmer
and have been expelling larvae. Hopefully, they were from
the other queen or a laying worker. So far no eggs, but the
new queen has only been released for a few days.
New Contract
The new job is going very well! I am borrowing one of their
laptop computers and work from the camper. It's wonderful!
I can work on personal tasks while the computer crunches
numbers. Writing of such, I replaced the kitchen faucet.
The original was leaking a little. The new one looks very
similar except with smoked handles, instead of clear.
Fruit Trees & Grapevines, etc.
The plum trees arrived, and I have put them in the ground.
All of the trees are showing leaves! I cut down a short
hemlock to allow a little more morning light on the plum
trees. The trees all have different shaped leaves. Pretty cool!
The grapevines have woken up. I removed all sprouts
except the highest one on each cane. The hope is that they
will eventually grow from the spurs and hang down
(with weights). If not, I'll grow another cane as high as
possible on the original canes. I have removed a number
of
tiny clusters of grapes.
I will only allow the mature 'vines to bear fruit on the spurs.
The Lingonberry bush has new growth and flowers! I think
it's going to flourish. The Huckleberry is slow to overcome
transplanting shock. Its leaves are glossy so it should be OK.
The blueberry bushes have lots of fruit. I didn't trim off as
many canes this past March, which is the reason. Blueberry
flowers only form on last year's growth.
Cellar
I ran into a problem with drainage for the cellar. I couldn't
find a path to a low spot to drain the perimeter drain. The
current idea is to dig a spot near the foundation as deep as
possible. Then, it could be filled with crushed stone and
covered with landscaping fabric before putting fill over it.
I could test the dry well to ensure that it could keep up with
the flow rate from a hurricane. I need to determine the
footprint of the dry well, since I have about 20 inches depth
below where the perimeter drain will be.
Site Updates
I've added five films & one TV program to the
GRS database.
Enjoy!
Friday, 29th of April
Orchard
The single pear that wasn't budding is showing signs of life!
The two plum trees should arrive today. My goal is to get
them in the ground today. Also, the grapevines are starting
to bud. I'll spray them all with dormant insecticide on Sunday,
once the wind stops.
Honeybees
I installed the honeybees a week ago. Both packages look
healthy! The queens should be released by now. We've been
feeding them every couple of days. I'll continue to do so until
three frames are drawn and full of honey, etc.
New Contract
I'm beginning a new contract in a couple of weeks. It's for a
Virginian firm. I'll drive there, be trained with their procedures, be
issued a laptop computer, and then work from home.
This
"remote" thing will be something new to me. It will give me time
during the day to check on my place. I hope to move into my
place when I return. I need to organize the camper and move
it to my generous neighbor's hook-ups.
Site Updates
I've added five films to the
GRS database.
Enjoy!
Tuesday, 19th of April
Orchard
One pear is still dormant. It has been cool, so
no real surprise! I have been billed for the two plum trees,
so they should be shipping soon.
Cellar
I was happily digging away when I hit what is called locally
ledge. It's a term for bedrock that is just below the surface.
It brings annoyance and dread to many builders!
The troublesome bit of ledge is right in the middle of the
excavation site! And it is only a foot below grade! Short of
blasting, I have no recourse. So the cellar will be half the size
that I planned. There are a couple of positive points. It will
cost quite a bit less to build it, and I reduced the thickness
of the rafters, which means less fill and money.
Collecting materials has been going well. I just got the Dually
inspected yesterday so I can use it to retrieve the larger
items like rafters and plywood. It's excellent having an eight-foot
bed!
I need to do a little more digging and then I can level the hole.
Then, I'll start building the forms and place the rebar for the
concrete footing. I have a new rebar bender/cutter ready to go.
Site Updates
I've added five films to the
GRS database
and all earned full GRS ratings. Enjoy!
Wednesday, 7th of April
Orchard
All of the trees are showing buds except one pear. Good sign!
The two plum trees should be shipping soon.
Cellar
I'm collecting materials and tools for the storage cellar. I'll finish
digging the hole next week, when rainstorms stop.
Site Updates
I've added seven films to the
GRS database.
Enjoy!
Thursday, 24th of March
Orchard
Welcome to spring!
I took photos of the fruit trees; however, they didn't work out too
well because the deer fence adds a confusing bunch of lines. Below
part of the orchard is pictured and an individual tree.
After painting the bottom foot or so with white paint,
I enclosed a
few trees in the three sections of deer fencing. I left space for
the two plum trees. I used the unearthed stones to surround the
trees.
Saturday, 19th of March
Orchard
Yesterday, I planted seven of nine fruit trees! Only the two plum trees
are still at the nursery. I used the backhoe attachment to
dig the holes. It was a good thing because I unearthed a number
of medium stones, including several boulders. Did you know
that the threshold for a boulder is 75 pounds? I have lots of
boulders using that definition!
Site Updates
I've added eight films & a TV program to the
GRS database.
Enjoy!
Tuesday, 1st of March
Monson
Established in 1746, Monson was the home of several
families. Today, the area is protected in a State Forest.
The roads are now trails. The Gould House has been
reconstructed.
The other buildings are long gone. Cellar
foundations and holes remain. It would be an easy hike
in any season but late winter! There's a swamp north of
the former settlement. Below are some photos that I
took of the area.
Project
In addition to planting an orchard, John and I are going
to build an earth-sheltered storage cellar! It'll provide me with
200 square feet of enclosed, warmish storage. I will put in
a ventless LPG (propane) heater to regulate the
temperature.
I'll install the batteries for the solar system in there. I'll be
able to run water to it for distribution where I need it. It will
be excellent to have tools and other stuff, which are currently
jammed in the soft garage, in there, too.
A snag is the fact that I can't dig deeper than about 3-4 feet.
I hit solid bedrock. Short of blasting, nothing can be done.
It would be good to have the entire structure below ground.
Oh well.
Also, I may have to put in a sump pump, if we can't run
the perimeter drain to a low spot. I'll know in the spring
when I finish digging and use my transit to look for a
nearby low spot.
The structure will be surrounded by earth with a bulkhead
entrance. The roof will be covered with a few inches of
forest debris. I'll insulate the walls and between the rafters to
minimize heating costs.
The previously-reported CAD package for the solid model
didn't work too well. I abandoned making a model and
focused on a bill of materials (BOM). John and I will review the
drawing and BOM soon. Then, I'll start acquiring materials and
tools.
Site Updates
I've added nine films to the
GRS database
including a new favorite. Enjoy!
Tuesday, 8th of February
Site Updates
I've added six films to the
GRS database
Enjoy!
Parting Thoughts
Telling other individuals what to do isn't tolerance.
Ignoring another's ideas because they don't align with yours is closed-minded.
Trying to force your will on another because you disagree is dangerous.
Tuesday, 25th of January, 2022
Orchard
One of the 2022 improvements to my lot will be a fruit
orchard! Yes, I've already ordered the trees. My neighbor
across the street ordered a few, too. They'll
be a bit too young to produce anything until after a
few years; however, it's part of my long term plan
for self-sufficiency.
All will be grafted on dwarfing rootstocks. They
limit the height to a maximum of 15 feet while
still producing full-size fruit. The best of both worlds!
Here's what I'll plant:
Two sweet cherries
Two apples
Two pears
Two plums
One peach
Why only a single peach tree? Peach trees are self-fertile.
I really didn't need to double the other trees, since
examples of each are available within pollination
distance. Though, that would be contrary to my goal of
self-sufficiency.
The orchard will be located just east of the solar panels.
Recall the 400-500-square-foot empty area centered
around the Magic Carpet Thyme? I had cleared another
bed for seeds. (Both of these plans I reported in September.)
The seeds are garlic, which
should help to repel many non-beneficial insects from
the fruit trees. I have invested in a sprayer and fruit-tree
spray. It's not organic; however, I want to maximize the
fruit trees chances for at least the first year or two. I can
look for an organic spray in the future. I will be spraying
the grapes, too. Otherwise, I can't keep up with the
Japanese beetles.
Additional Plans for 2022
My plans for another project are nearing completion.
Due to the complexity, I have made drawings and am
finishing a solid model. Both CAD packages are
available free-of-charge. They don't work as well as their
proprietary counterparts. But the price is right
Continue to return. I'll uncover the project soon!
Site Updates
I've added eleven films to the
GRS database
Enjoy!
Tuesday, 11th of January, 2022
Bees!
I placed an order for two packages of honeybees yesterday!
I'll be able to pick them up in mid-April, depending on
weather. Why two queens and bees? Mom has decided to
keep bees, also. Fun!
The apiary is ready. We'll just need to set up our hives in
the spring. Having two hives will mean a yield around 200
pounds!
Site Updates
I've added nine films to the
GRS database
and one quote:
I thought all robots were supposed to evil.
It depends on the model.
Turbo Kid and Apple in
Turbo Kid
Enjoy!
|